Decide Fast & Get 50% Flat Discount on This New Year Special Offer | Limited Time Offer - Ends In COUPON CODE: NY26

Practice NCARB Project-Planning-Design Exam Questions

    1. Page: 1/20
      Total 100 Questions
    Question No 1
    An architect is commissioned to design a lodge in a location where the water service is insufficient for a sprinkler system. The architect plans to maximize sight lines by using exposed columns and roof structure in the primary assembly space. Which of the following systems meet these requirements? Check the three that apply.
    Choose the Choices:


    Question No 2
    For a three - story building, which of the following is considered a vertical irregularity with respect to seismic design?
    Choose the Choices:


    Question No 3
    An architect is designing a multistory student housing project to be built of light wood framing. The following criteria must be met Minimize the floor assembly thickness Maximize ceiling height No individual HVAC room controls No exposed ductwork Which HVAC system should be selected for this project?
    Choose the Choices:


    Question No 4
    Which of the following is considered when using natural light as the primary source of ambient light to improve building quality and reduce energy costs?
    Choose the Choices:


    Question No 5
    An existing building containing the maximum allowable area may be extended horizontally provided the extension is separated from the existing building by which one of the following?
    Choose the Choices:



    1. Page: 1/20
      Total 100 Questions